2026-09-21 · KeXinMaterials 編集チーム
MOQ およびリードタイム 保護ケース B2B 詳細ガイド (2026):在庫 / OEM / 新規金型
すべての保護ケース B2B バイヤーが最初に同じ 2 つの質問をします:最小注文数量はどれくらいか、納品までどのくらいかかるか?これがすべての 3 つの MOQ 階層と実際の生産タイムラインをカバーする 2026 詳細ガイドです。
なぜ MOQ とリードタイムがすべての B2B 決定を左右するのか
MOQ and lead time determine cash flow, programme timeline, and total procurement cost. Match your procurement profile to the right MOQ tier.
A regional distributor ordering 200 pieces for a pilot programme cannot wait 60-90 days for a new mould — they need 7-15 day stock SKU + logo. A defence prime contracting 5,000 pieces annually needs the 60-90 day new mould path for brand IP ownership.
MOQ tier and lead time are coupled: lower MOQ = faster lead time but higher per-unit cost; higher MOQ = longer lead time but lower per-unit cost. The B2B buyer's job is to pick the tier that matches programme profile.
ティア 1:在庫 SKU(MOQ 50-100、7-15 日生産)
Tier 1 stock SKU is the fastest and lowest-cost entry path. Best for pilot programmes, agency buyers, and regional distributors.
MOQ 50-100 pieces (some SKUs accept 25-piece trial orders). Production 7-15 days. Sea freight 18-35 days. Total 4-8 weeks door-to-door.
Per-unit cost: USD 60-180 stock case + USD 50-200 custom foam (optional). Sample fee USD 50-100 (often waived for trial orders above 50 pieces).
Customisation depth: logo via silk-screen, hot stamp, laser, UV spray. Colour: Pantone / RAL within factory dye range (typically 1-3 colour variants per SKU). Foam: pick-and-pluck (immediate) or CNC-cut (7-10 days sample).
Suitable for: pilot programmes, agency buyer trials, regional distributors (annual volume < 1,000 pieces), defence small-quantity procurement, OEM sales-channel expansion.
ティア 2:在庫金型上のカスタム OEM(MOQ 100-300、30-45 日生産)
Tier 2 custom OEM balances brand differentiation with reasonable lead time. Best for branding programmes and mid-volume distributors.
MOQ 100-300 pieces. Production 30-45 days. Sea freight 18-35 days. Total 6-10 weeks door-to-door.
Per-unit cost: USD 85-280 (case + foam + logo + colour). Tooling / setup fee USD 200-500 amortised in unit cost. Sample fee USD 200-500 refundable against bulk order.
Customisation depth: full Pantone / RAL colour match (factory dye batch). Logo: silk-screen (1-3 colours), hot stamping (metallic foil), laser engraving, UV spray (raised texture). Foam: CNC-cut custom cavities (any geometry). Latch upgrade: key lock, push-button, TSA lock.
Suitable for: brand-owned programmes (1,000-5,000 pieces annual volume), OEM tool kit assembly, regional distributors seeking brand differentiation, mid-volume B2B programmes with brand requirements.
ティア 3:新規金型カスタム OEM(MOQ 1,000+、60-90 日金型 + 30-45 日生産)
Tier 3 new mould provides full IP ownership and brand differentiation. Best for serious brand-owned programmes and defence prime contracts.
MOQ 1,000-5,000 pieces amortised over 12-24 months. Mould lead time 60-90 days. Production 30-45 days. Sea freight 18-35 days. Total 6-9 months first batch, 4-8 weeks subsequent batches.
Per-unit cost (post-amortisation): USD 50-220 per case depending on size and certification. Tooling cost USD 8,000-30,000 (single-cavity mould) or USD 15,000-50,000 (multi-cavity family mould). Sample fee USD 500-1,500 refundable against order ≥ 1,000 pieces.
Customisation depth: full geometry customisation (any dimension, any shape). Mould IP transfer to buyer. Special features: in-mould logo, custom hinge / latch geometry, integrated accessories (wheels, handles, dividers).
Suitable for: brand-owned retail programmes (5,000+ pieces annual volume), defence prime contracts (single lot 1,000-5,000 pieces), OEM tool kit programmes with stable spec over 12+ months, brand IP licensing programmes.
リードタイム構成:日数がかかる部分
A typical 4-8 week total lead time decomposes into 7 stages. Each stage adds delay if missed.
Day 1-3: Specification alignment (buyer shares drawing + colour + logo + foam spec).
Day 4-7: Quote + DFM feedback (factory reviews for feasibility).
Day 8-14: Sample production (standard samples 7-10 days, custom foam 14-21 days).
Day 15-21: Sample shipment + evaluation (DHL / FedEx air freight USD 30-80).
Day 22-30: Production tooling prep (existing mould 3-5 days; new mould 25-30 days).
Day 31-75: Mass production (30-45 days for 100-1,000 piece MOQ).
Day 76-110: Ship + deliver (sea freight 18-35 days, import clearance 3-7 days, last-mile 1-3 days).
ティア別生産能力
Capacity planning prevents the factory over-promising and missing your delivery.
Tier 1 stock SKU: factory can typically produce 5,000-10,000 pieces per SKU per month. Allocation-based scheduling; place order 2-4 weeks before needed.
Tier 2 custom OEM: 3,000-5,000 pieces per SKU per month. Production line scheduled by tier 2 project manager.
Tier 3 new mould: 1,000-3,000 pieces per mould per month. New mould qualification batch adds 15-20 days.
At KeXinMaterials we run 60+ injection moulding machines across 13,000 m² facility. Annual capacity 800,000+ cases. Tier 1 lead time 7-15 days, Tier 2 lead time 30-45 days, Tier 3 lead time 60-90 days mould + 30-45 days production.
リードタイムの交渉方法
Three levers shorten lead time without sacrificing quality.
Lever 1: Choose stock mould over new mould. New mould adds 60-90 days. Stock mould is 3-5 days changeover.
Lever 2: Pre-produce samples before bulk order. Sample 7-10 days parallel to bulk material prep.
Lever 3: Place annual volume commitment. Factory allocates production line capacity for your programme, reducing queue time.
At KeXinMaterials we offer 50-piece trial order for new buyers to test quality before bulk commitment. Sample evaluation is highly recommended for OEM programmes.
なぜ B2B 調達に KeXinMaterials を選ぶのか
KeXinMaterials operates 60+ injection moulding machines in a 13,000 m² facility since 2014. 200+ active SKUs covering 9 product lines. Three MOQ tiers to match any procurement profile.
Tier 1: 50-100 piece MOQ, 7-15 day production, USD 60-180 stock case.
Tier 2: 100-300 piece MOQ, 30-45 day production, USD 85-280 custom OEM.
Tier 3: 1,000+ piece MOQ, 60-90 day mould + 30-45 day production, USD 50-220 post-amortisation.
Certifications: ISO 9001:2015, CE / RoHS / REACH, FDA compatibility statement for medical SKUs, NSN registration support for defence SKUs. Trade terms: EXW Shenzhen / FOB Shenzhen / FOB Ningbo.
重要なポイント
- ティア 1 在庫 SKU:MOQ 50-100、7-15 日生産、USD 60-180/ケース
- ティア 2 カスタム OEM:MOQ 100-300、30-45 日生産、USD 85-280/ケース
- ティア 3 新規金型:MOQ 1,000+ 償却、60-90 日金型 + 30-45 日生産
- ドア・ツー・ドア合計リードタイム 4-8 週間(ティア 1/2)または 6-9 ヶ月初回バッチ(ティア 3)
- KeXinMaterials の年間生産能力は 60+ 機械で 800,000+ ケース
よくある質問
保護ケースの MOQ は?
3 つのティア:ティア 1 在庫 SKU MOQ 50-100 個(一部 SKU は 25 個試注文)。ティア 2 在庫金型上のカスタム OEM MOQ 100-300 個。ティア 3 新規金型フルカスタム MOQ 1,000-5,000 個を 12-24 ヶ月で償却。サンプル料金:ティア 1 USD 50-100、ティア 2 USD 200-500、ティア 3 USD 500-1,500。すべてのティアで大量注文時に返金可能。
保護ケース注文の典型的なリードタイムは?
ティア 1 在庫 SKU:7-15 日生産 + 18-35 日海上輸送 = 4-8 週間ドア・ツー・ドア。ティア 2 カスタム OEM:30-45 日生産 + 18-35 日海上輸送 = 6-10 週間ドア・ツー・ドア。ティア 3 新規金型:60-90 日金型 + 30-45 日生産 + 18-35 日海上輸送 = 6-9 ヶ月初回バッチ、4-8 週間後続バッチ。
在庫金型と新規金型の違いは何ですか?
在庫金型は工場の既存金型です — 色、ロゴ、フォームでカスタマイズできる在庫 SKU の生産に使用。工具コスト USD 0(在庫 SKU で既に償却)。交換 3-5 日。新規金型は買い手の特定の形状に合わせてカスタム構築されます。工具コスト USD 8,000-30,000(単一キャビティ)または USD 15,000-50,000(マルチキャビティファミリー)。金型リードタイム 60-90 日。新規金型は IP 所有権を買い手に移転します。
試用に 25-50 個注文できますか?
ティア 1 在庫 SKU では可能です。ほとんどの工場は、買い手が品質を評価できるように、在庫 SKU で 25-50 個の試用注文を受け入れます。50 個を超える試用注文ではサンプル料金が免除されることが多いです。ティア 2 カスタム OEM とティア 3 新規金型は、セットアップと工具コスト償却のため、より高い MOQ(100+ および 1,000+)があります。
最も費用対効果の高い MOQ 階層はどれですか?
ティア 3 新規金型は最も低い単価(償却後 USD 50-220)ですが、最も高い前払い金型投資(USD 8,000-30,000)。ティア 2 カスタム OEM は中程度の単価(USD 85-280)で、最小限の前払い(USD 200-500 セットアップ)。ティア 1 在庫 SKU は最も高い単価(USD 60-180)ですが、前払いなし。B2B バイヤーにとって最も費用対効果が高いのは、年間総量によって異なります:500 個/年未満 = ティア 1;500-3,000 個/年 = ティア 2;3,000 個/年超 = ティア 3。
リードタイムを短縮するにはどうすればよいですか?
3 つのレバー:(1)新規金型ではなく在庫金型を選択 — 新規金型は 60-90 日追加。(2)大量注文前にサンプルを事前生産 — バルク材料準備と並行してサンプル 7-10 日。(3)年間数量コミットメントを行う — 工場がプログラム用の生産ライン能力を割り当て、待ち時間を短縮。KeXinMaterials では、バルクコミットメント前に品質をテストするために新しいバイヤー向けの50試注文を提供しています。