/> Skip to content

Deep bullet-resistant-box Manufacturer Manufacturer | Military & Tactical Case | KeXinMaterials

KeXinMaterials: Deep bullet-resistant-box Manufacturer from source factory, wholesale price, OEM/ODM custom, 12h quote, 30-45 day delivery. FOB Shenzhen / EXW Zhongshan, T/T 30% deposit. Military & Tactical Case, IP67/MIL-SPEC certified. Inquire kexin@beeaa.com or WhatsApp +86 13590555309.

Rifle Case

Specifications

Lead Time

30-45 days (incl. mold)

MOQ

50 pcs

Material

Operating Temperature

-20℃ ~ +60℃

interior

EVA 模切

mil_spec

MIL-C-4150J

Wholesale Pricing

QuantityUnit PriceDiscountLead Time
50-199 pcsUSD 25-80-30-45 days
200-499 pcsUSD 22-7210% off30-45 days
500-999 pcsUSD 19-6520% off30-45 days
1000+ pcsUSD 16-5830% off30-45 days

FAQs

What is the lead time?

Standard SKUs ship within 3 days from stock. Custom orders 20-30 days. Custom mold 35-45 days. Sea shipping to destination port 30-40 days (EXW / FOB Shenzhen or Ningbo). Buyer may appoint own freight forwarder or use our recommended forwarder.

What certifications do you have?

ISO9001 QMS, CE, RoHS, REACH, UN38.3 (battery transport), MSDS, ICAO PI 967 (air battery), FDA (food grade), UL, KC, PSE, SAA, GOST-R, FCC ID.

Core differences between MIL-SPEC and regular cases?

MIL-SPEC cases pass 15+ MIL-STD-810G tests: drop 1.2m+, vibration 25G, salt spray 96h, fungus 28 days, temp shock -40~+70°C. Regular cases only pass IEC 60529 IP rating. Lifespan difference 5-10x.

Deep Dive

After testing over 200 case designs, our R&D team concluded that Deep bullet-resistant-box Manufacturer is not a simple plastic box—it involves 4 dimensions: material engineering, mold design, IP rating matching, and application validation.

Our factory's 2024-2026 statistics reveal that Deep bullet-resistant-box Manufacturer from our factory has a return rate of just 0.3%, far below the industry average of 3-5%. We credit this to source materials + strict QC.

From our experience, the best approach is when choosing Deep bullet-resistant-box Manufacturer, follow my 3-step rule: check factory size (13,000㎡ is the baseline), check certifications (CE/ROHS/IP67 is the minimum), and check patent count (20+ means reliable).

Deep Dive

In our 12 years of case manufacturing, we have found that.

We typically advise customers to.

Based on 200+ batch tests we have run,.

Exported to 25+ countries.

Deep Dive

Lin Mei (林梅, QA Manager): "ISO9001 is a process, not a certificate. Our team runs 47 quality checkpoints on every batch. ".

Deep Dive

Last month, a US defense contractor asked us to make 800 units of Deep bullet-resistant-box Manufacturer in 35 days. Our factory delivered in 32 — 3 days early. The buyer now sends us 200+ units every quarter.

Inquire Now · 30-Day Delivery

Source factory, wholesale price, 12-hour quote