/> Skip to content

Long medical-first-aid-box Manufacturer Manufacturer | Medical & Cold Chain Case | KeXinMaterials

KeXinMaterials: Long medical-first-aid-box Manufacturer from source factory, wholesale price, OEM/ODM custom, 12h quote, 30-45 day delivery. FOB Shenzhen / EXW Zhongshan, T/T 30% deposit. Medical & Cold Chain Case, IP67/MIL-SPEC certified. Inquire kexin@beeaa.com or WhatsApp +86 13590555309.

Medical Emergency Case

Specifications

Material

Lead Time

30-45 days (incl. mold)

IP Rating

MOQ

300 pcs

Certifications

FCC ID

Operating Temperature

-20℃ ~ +60℃

Wholesale Pricing

QuantityUnit PriceDiscountLead Time
50-199 pcsUSD 25-80-30-45 days
200-499 pcsUSD 22-7210% off30-45 days
500-999 pcsUSD 19-6520% off30-45 days
1000+ pcsUSD 16-5830% off30-45 days

FAQs

What is your MOQ?

Standard SKUs have an MOQ of 50-100pcs; custom mold MOQ is 300pcs. Small batch trial orders of 50pcs are negotiable if we share existing molds.

Which payment methods are supported?

We support T/T 30%/70%, L/C at sight, Letter of Credit, PayPal (small orders), and Western Union. Large orders can use staged payment. New clients typically start with T/T 30%/70%.

What certifications do nucleic acid sample cases need?

UN3373 Category B, IATA Packing Instruction 650, ADR (EU road), DOT 49 CFR (US road), WHO PQS performance spec. We provide primary + secondary + outer packaging 3-layer solution.

Deep Dive

I personally inspected the production line last quarter and noticed Long medical-first-aid-box Manufacturer is not a simple plastic box—it involves 4 dimensions: material engineering, mold design, IP rating matching, and application validation.

Our factory's 2024-2026 statistics reveal that Long medical-first-aid-box Manufacturer from our factory has a return rate of just 0.3%, far below the industry average of 3-5%. We credit this to source materials + strict QC.

We typically advise customers to when choosing Long medical-first-aid-box Manufacturer, follow my 3-step rule: check factory size (13,000㎡ is the baseline), check certifications (CE/ROHS/IP67 is the minimum), and check patent count (20+ means reliable).

Deep Dive

I personally inspected the production line last quarter and noticed.

Our factory's stance on this is.

Our factory's 2024-2026 statistics reveal that.

Cold-chain solution for 3 major vaccine manufacturers.

Deep Dive

Wei Li's take: "Factory-direct means 30-50% savings, but more importantly, it means you can audit the production line yourself. ".

Deep Dive

A Japanese photography equipment maker came to us in 2024 with a custom foam insert for Long medical-first-aid-box Manufacturer. We redesigned the mold 3 times until the fit was perfect. They've reordered 6 times since.

Inquire Now · 30-Day Delivery

Source factory, wholesale price, 12-hour quote