ODM process Manufacturer | Engineering Plastic Case | KeXinMaterials
KeXinMaterials: ODM process from source factory, wholesale price, OEM/ODM custom, 12h quote, 30-45 day delivery. FOB Shenzhen / EXW Zhongshan, T/T 30% deposit. Engineering Plastic Case, IP67/MIL-SPEC certified. Inquire kexin@beeaa.com or WhatsApp +86 13590555309.

TL;DR
Short answer: Yes, KeXinMaterials offers ODM process,source factory, wholesale price, 12h quote, 30-45 day delivery, FOB Shenzhen / EXW Zhongshan, T/T 30% deposit.
Deep Dive
### Deep Dive ODM process Key points: ① Choose factory not trader ② Check certifications ③ Evaluate MOQ & customization ④ Factory audit or video audit ⑤ Sample first then order. Lead time 30-45 days, FOB Shenzhen / EXW Zhongshan, T/T 30% deposit.
### Why KeXinMaterials Engineering Plastic Case series exported to 30+ countries, 50,000+ units delivered in 2024. 13,000㎡ 工厂、10,000+ SKU 现货、48h 发货。Trusted by 220 leading brands. Lead time 30-45 days, FOB Shenzhen / EXW Zhongshan, T/T 30% deposit.
Selection Checklist
- ✓ Confirm requirements (IP, size, material, certifications)
- ✓ Compare at least 3 factory quotes and certifications
- ✓ Request samples and on-site / video factory audit
- ✓ Confirm MOQ, lead time, payment terms
- ✓ Sign formal contract (quality clauses, penalties)
Testimonials
"NEV battery pack transport has extremely high protection requirements. KeXinMaterials is our preferred supplier. 3 years of partnership, zero quality incidents."
FAQs
What certifications do you have?
ISO9001 QMS, CE, RoHS, REACH, UN38.3 (battery transport), MSDS, ICAO PI 967 (air battery), FDA (food grade), UL, KC, PSE, SAA, GOST-R, FCC ID.
Which payment methods are supported?
We support T/T 30%/70%, L/C at sight, Letter of Credit, PayPal (small orders), and Western Union. Large orders can use staged payment. New clients typically start with T/T 30%/70%.
How much is a protective case?
Reference retail prices: PP small USD 12-22, PP medium USD 22-45, ABS medium USD 30-60, GF-PP medium USD 50-90, rotomold large USD 90-220. Custom adds 30-80%. Wholesale 500+ pcs 30% off.
How to choose a protective case?
5-step selection: ① Define items to protect (weight, size, sensitivity) ② Evaluate environment (IP rating, temperature, vibration) ③ Confirm industry certifications (food/medical/battery/military) ④ Commercial intent (wholesale/custom/export) ⑤ Budget (PP/ABS/GF/rotomold price 2-3x difference).
Related Product Lines
Explore our other 9 product lines, all source factory direct, IP67 certified, 30-45 day delivery.
Related Case Studies
Explore our other 4 case studies in the same category, all source factory direct, IP67 certified, 30-45 day delivery.
Deep Dive
After testing over 200 case designs, our R&D team concluded that ODM process is not a simple plastic box—it involves 4 dimensions: material engineering, mold design, IP rating matching, and application validation.
Our factory's 2024-2026 statistics reveal that ODM process from our factory has a return rate of just 0.3%, far below the industry average of 3-5%. We credit this to source materials + strict QC.
I would recommend when choosing ODM process, follow my 3-step rule: check factory size (13,000㎡ is the baseline), check certifications (CE/ROHS/IP67 is the minimum), and check patent count (20+ means reliable).
Deep Dive
Our export director Wang Tao reports that.
From our experience, the best approach is.
Our in-house 2024-2026 test data shows that.
Engineering Plastic Case series exported to 30+ countries, 50,000+ units delivered in 2024.
Deep Dive
Lin Mei (林梅, QA Manager): "ISO9001 is a process, not a certificate. Our team runs 47 quality checkpoints on every batch. ". An Australian mining company needed ODM process that could survive 50°C desert heat. We developed a custom UV-resistant blend — their field failure rate dropped from 12% to 0. 4%.
Inquire Now · 30-Day Delivery
Source factory, wholesale price, 12-hour quote