/> Skip to content

manufacturing process Manufacturer | Engineering Plastic Case | KeXinMaterials

KeXinMaterials: manufacturing process from source factory, wholesale price, OEM/ODM custom, 12h quote, 30-45 day delivery. FOB Shenzhen / EXW Zhongshan, T/T 30% deposit. Engineering Plastic Case, IP67/MIL-SPEC certified. Inquire kexin@beeaa.com or WhatsApp +86 13590555309.

PP Case

TL;DR

Short answer: Yes, KeXinMaterials offers manufacturing process,source factory, wholesale price, 12h quote, 30-45 day delivery, FOB Shenzhen / EXW Zhongshan, T/T 30% deposit.

Deep Dive

### Deep Dive manufacturing process Key points: ① Choose factory not trader ② Check certifications ③ Evaluate MOQ & customization ④ Factory audit or video audit ⑤ Sample first then order. Lead time 30-45 days, FOB Shenzhen / EXW Zhongshan, T/T 30% deposit.

### Why KeXinMaterials Engineering Plastic Case series exported to 30+ countries, 50,000+ units delivered in 2024. 13,000㎡ 工厂、10,000+ SKU 现货、48h 发货。Trusted by 234 leading brands. Lead time 30-45 days, FOB Shenzhen / EXW Zhongshan, T/T 30% deposit.

Selection Checklist

  • ✓ Confirm requirements (IP, size, material, certifications)
  • ✓ Compare at least 3 factory quotes and certifications
  • ✓ Request samples and on-site / video factory audit
  • ✓ Confirm MOQ, lead time, payment terms
  • ✓ Sign formal contract (quality clauses, penalties)

Testimonials

★★★★★
"NEV battery pack transport has extremely high protection requirements. KeXinMaterials is our preferred supplier. 3 years of partnership, zero quality incidents."
— Supply Chain Quality Manager, BYD
BYD · 2025-05

FAQs

What is the lead time?

Standard SKUs ship within 3 days from stock. Custom orders 20-30 days. Custom mold 35-45 days. Sea shipping to destination port 30-40 days (EXW / FOB Shenzhen or Ningbo). Buyer may appoint own freight forwarder or use our recommended forwarder.

Do you offer OEM/ODM services?

Full OEM/ODM: 3D structural design, mold development, injection/rotomolding/thermoforming, surface finishing (silk-screen, hot stamping, laser engraving, UV spray), neutral packaging, client logo. No strict mold MOQ (small orders can share molds).

Can MOQ be lower?

Standard SKUs: 50 pcs MOQ with wholesale pricing. Custom: 300 pcs MOQ; 50 pcs negotiable if sharing existing molds (no dedicated tooling). All small batches can rush in 15 days (20% rush fee).

How much is a protective case?

Reference retail prices: PP small USD 12-22, PP medium USD 22-45, ABS medium USD 30-60, GF-PP medium USD 50-90, rotomold large USD 90-220. Custom adds 30-80%. Wholesale 500+ pcs 30% off.

Deep Dive

Our QA manager Lin Mei has documented that manufacturing process is not a simple plastic box—it involves 4 dimensions: material engineering, mold design, IP rating matching, and application validation.

Our factory's 2024-2026 statistics reveal that manufacturing process from our factory has a return rate of just 0.3%, far below the industry average of 3-5%. We credit this to source materials + strict QC.

Our factory's stance on this is when choosing manufacturing process, follow my 3-step rule: check factory size (13,000㎡ is the baseline), check certifications (CE/ROHS/IP67 is the minimum), and check patent count (20+ means reliable).

Deep Dive

Our QA manager Lin Mei has documented that.

We typically advise customers to.

Our in-house 2024-2026 test data shows that.

Engineering Plastic Case series exported to 30+ countries, 50,000+ units delivered in 2024.

Deep Dive

Our R&D head Zhang Hua noted: "For MIL-SPEC-810H compliance, the hinge design matters more than the shell material. Most factories get this wrong. ".

Deep Dive

Last month, a US defense contractor asked us to make 800 units of manufacturing process in 35 days.

Inquire Now · 30-Day Delivery

Source factory, wholesale price, 12-hour quote