> > Skip to content

led-screen-case certification process: Buyer's Guide, Decision Framework, Common Mistakes | KeXinMaterials

led-screen-case certification process from KeXinMaterials source factory. OEM/ODM, wholesale, factory-direct pricing. 9 WL series sizes WL1204-WL5020, IP67/MIL-STD-810H certified, MOQ 100, 12h quote, 30-day delivery to 47 countries.

led-screen-case certification process: The Precise Definition

What is led-screen-case certification process, really? The term gets used loosely in the B2B protective case market. Here is the precise definition, what it includes, and what it does not.

WL Series at a Glance: led-screen-case certification process Specs

If you have not worked with the WL series before, this is the cheat sheet. WL1204-WL1504 are Small (under 200mm). WL1905-WL2808 are Medium (200-300mm). WL3812-WL5020 are Large (300-500mm). Within each tier, the model number encodes the length, width, height in cm.

ModelOuter (mm)Inner (mm)Weight (g)MaterialSize Class
WL1905 190×190×45 mm 180×160×40 mm 250 g PP Medium
WL2005 195×170×46 mm 190×135×40 mm 175 g PP Medium
WL2405 240×200×53 mm 220×162×49 mm 290 g PP Medium

The most common model for "led-screen-case certification process" buyers is the WL1905 (190×190×45 mm OD, 250 g empty weight, PP body).

Why Foam Density Matters for led-screen-case certification process

Cheap protective cases use 15 kg/m³ foam that bottoms out after 6 months. Our led-screen-case certification process uses 25 kg/m³ foam rated for 5+ year use. The difference is in the cell structure: 25 kg/m³ cells rebound after compression, 15 kg/m³ cells do not. We have tested both. The cheaper foam fails.

The shell is rated IP67 ingress protection and validated to MIL-STD-810H Method 516.8 (26 drops at 1.2m). Temperature range is -40 ~ +80 °C. The automatic pressure-equalization valve keeps the seal intact during air transport and at altitude. Latch is a double-throw design rated for 5,000 open/close cycles. All units are 100% inspected for wall thickness uniformity, latch engagement, and foam adhesion before shipping.

What Equipment Fits in led-screen-case certification process

Common equipment we have designed led-screen-case certification process foam layouts for, based on real customer projects since 2014: DSLR + 2-3 lenses, mirrorless kits, cinema cameras with matte box + monitor, drones (DJI Mavic/Phantom/Inspire) with 5 batteries, broadcast lighting kits, military optics, medical devices.

led-screen-case certification process Cost vs Value: 5-Year View

Cheap led-screen-case certification process: $3-8/unit, 6-month lifespan, 200-cycle latch, 15 kg/m³ foam. Our led-screen-case certification process: $5-15/unit, 10-year lifespan, 5,000-cycle latch, 25 kg/m³ foam. Over 5 years, our case is 4-5x cheaper per year of use. Total cost of ownership wins.

For alternatives: soft padded bags (¥50–200, $7–30) are cheaper but offer no real protection and last 6 months. Aluminum hard cases ($80–300) are heavier, prone to denting, and 2–4× the price. Carbon fiber cases ($300+) are overkill for 95% of B2B use cases. Our PP/PC engineering cases hit the sweet spot: 90% of the protection of aluminum at 30% of the weight and 50% of the cost, with 10-year typical service life.

led-screen-case certification process Shipping Worldwide

We ship led-screen-case certification process to 47 countries via FOB Shenzhen, CIF, DDP, EXW. Sea: 12-38 days by region. Express (DHL/FedEx): 3-7 days for samples. Full container load: 28-35 days. We provide commercial invoice, packing list, certificate of origin, IP test certificate with every shipment.

Why Choose KeXinMaterials

If you do not see your question here, ask us at kexin@beeaa.com. We respond within 12 hours.

Key Specifications

Ingress Protection
IP67
Drop Test (MIL-STD-810H)
1.2m / 26 cycles
Temperature Range
-40 ~ +80 °C
Latch Type
Double-Throw Latch
Pressure Valve
Automatic Pressure Equalization
Certifications
ISO 9001:2015, ROHS, CE, FCC, IP67

Why Source Directly from KeXinMaterials

Established 2014. 13,000 sqm factory in Fusha Industrial Park, Shenzhen, Guangdong. 12 production lines, 60+ injection molding machines, 100+ employees, 20+ patents. Monthly capacity 80,000 units. Annual export revenue 8M+ USD to 47 countries.

Direct from the OEM. Unlike trading companies or sourcing agents who add 15–40% markup and disappear after delivery, KeXinMaterials handles everything in-house: mold development, injection molding, foam CNC cutting, QC testing, export documentation. Our 2024 buyer survey showed 87% repeat-order rate and 0.3% defect rate across 47 countries.

First-Party Lab Test Data

Validated in our lab, not marketing claims.

Bulk Pricing Reference (FOB Shenzhen)

QuantityUnit PriceDiscountLead TimeSample
50-99 pcsUSD 15.28—20 daysFree (pay shipping)
100-199 pcsUSD 13.515% off25 daysFree (pay shipping)
200-499 pcsUSD 11.7510% off30 daysFree (pay shipping)
500-999 pcsUSD 10.5815% off30 daysFree (pay shipping)
1000+ pcsUSD 9.4020% off35-45 daysFree (pay shipping)

Reference price for WL1905 (190×190×45 mm). Custom sizes, colors, foam add 5–30%. Quote valid 30 days.

Quick Reference Infographic

led-screen-case certification process: Buyer Decision Tree

[ Infographic — generation in progress ]

Visual summary of the key specifications. Print-friendly for buyer reference.

Product Video: led-screen-case certification process

📹 Video — Coming Soon
led-screen-case certification process buyer guide walkthrough, equipment fitting, quote process
📧 Request Video

📹 60-second factory + product walkthrough. led-screen-case certification process buyer guide walkthrough, equipment fitting, quote process

Frequently Asked Questions

Is led-screen-case certification process worth the cost vs alternatives?

Soft padded bags ($5-20, no protection, 6-month lifespan) or aluminum cases ($80-300, heavy, dent-prone) vs our PP/PC cases ($3.50-85 FOB) — best ROI for 80% of B2B use cases: IP67 + MIL-STD-810H + 10-year lifespan + lightweight.

How do I order led-screen-case certification process from KeXinMaterials?

5-step process: (1) Send inquiry to kexin@beeaa.com or WhatsApp +86 13590555309 with spec, quantity, destination. (2) Receive 12h quote with recommendation, pricing, lead time, shipping. (3) Confirm PO with 30% T/T deposit. (4) Production 30 days. (5) Pay 70% balance, ship FOB/CIF/DDP.

What if I receive a defective led-screen-case certification process?

Report within 48 hours with photos. We replace at no cost within 90 days. Defect rate <0.3% in 2024. For OEM/ODM orders, we keep tooling for 3 years — re-orders are 15-20 days lead time.

How do I verify the led-screen-case certification process is genuine?

Every shipment includes a lot certificate with serial numbers, manufacturing date, and QC inspector signature. Cross-check the serial number with our database at kexin@beeaa.com to verify authenticity and view the test report.

What is the difference between OEM and ODM for led-screen-case certification process?

OEM: you design, we manufacture. ODM: we design (based on your use case), you brand. OEM requires 3D model / spec sheet from you. ODM requires usage description only. OEM MOQ 500, ODM MOQ 200. Both lead time 25-30 days for tooling.

Related Resources

Get a 12-Hour Quote for led-screen-case certification process

Free 5-day prototyping. ISO 9001 factory-direct. Ships to 47 countries.